What should the buyer prepare at the site before installing a packaging machine?
• Reserve space per layout for main unit, film stand and conveyor, keeping ≥800mm service aisles.
• Provide a dedicated breaker sized to nameplate power; verify voltage/frequency/phase and reliable grounding.
• Supply stable 0.6–0.8MPa air with dryer and oil-water separator; size piping to air consumption.
• Level the floor and confirm load capacity; pre-drill anchor holes and keep levelness ≤2mm/m.
• Prepare tools, film and product samples, lifting equipment, and on-site electrician and operators.
• Provide a dedicated breaker sized to nameplate power; verify voltage/frequency/phase and reliable grounding.
• Supply stable 0.6–0.8MPa air with dryer and oil-water separator; size piping to air consumption.
• Level the floor and confirm load capacity; pre-drill anchor holes and keep levelness ≤2mm/m.
• Prepare tools, film and product samples, lifting equipment, and on-site electrician and operators.