What should buyers prepare before robot lead time and site installation?
• Confirm standard models ship in 8-12 weeks; custom units often exceed 16 weeks.
• Verify floor load capacity, power supply, and air pressure beforehand.
• Reserve space for safety fencing and PLC network interface locations.
• Require supplier installation plan, commissioning schedule, and acceptance milestones.
• Verify floor load capacity, power supply, and air pressure beforehand.
• Reserve space for safety fencing and PLC network interface locations.
• Require supplier installation plan, commissioning schedule, and acceptance milestones.